Nizam, M. Khairun (2020) Perancangan Metode Pelaksanaan Pekerjaan Jalan (Studi Kasus : Jalan Pambang – Teluk Lancar Sta 1+600 – Sta 3+100). Undergraduate thesis, Politeknik Negeri Bengkalis.
|
Text (Abstrak)
10. SKRIPSI - 4204161122 - ABSTRAK.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (6kB) | Preview |
|
|
Text (Bab I Pendahuluan)
2. SKRIPSI - 4204161122 - BAB I.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (248kB) | Preview |
|
|
Text (Daftar Pustaka)
7. SKRIPSI - 4204161122 - DAFTAR PUSTAKA.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (169kB) | Preview |
|
Text (Full Text)
9. SKRIPSI - 4204161122 - FULL TEXT.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (8MB) | Request a copy |
Abstract
Roads are the main infrastructure that is very influential in the economic sector in an area. The Pambang - Teluk Lancar road section, Bantan District, Riau Province, is the main connecting road to several villages at the end of the island of Bengkalis.The road condition is currently in a damaged condition and inadequate for public traffic. Therefore, the local government through the Public Works office has carried out road planning at that location, which is planned to be continued with the implementation of construction work in 2020. In designing this method, we get general procedures for the implementation of work from the beginning to the end of the work based on the required specifications. Then the quarry location used is the existing permanent quarry near the work location with a distance of ± 5 km from the work location. For the placement of workers' barracks and field offices, also use the existing or permanent ones around the quarry location.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | road, road implementation method, work tools | ||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil | ||||||||
Divisions: | Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR | ||||||||
Depositing User: | Editor Perpustakaan | ||||||||
Date Deposited: | 22 Jun 2021 08:54 | ||||||||
Last Modified: | 22 Jun 2021 08:54 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/374 |
Actions (login required)
View Item |