Afrizal, Afrizal (2021) Analisis Dampak Lalu Lintas Pembangunan Puskesmas Meskom Terhadap Kinerja Ruas Jalan Utama. Undergraduate thesis, Politeknik Negeri Bengkalis.
|
Text (Abstract)
1. SKRIPSI-4204171164-Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (278kB) | Preview |
|
|
Text (Bab I Pendahuluan)
2. SKRIPSI-4204171164-BAB I PENDAHULUAN.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (268kB) | Preview |
|
|
Text (Daftar Pustaka)
3. SKRIPSI-4204171164-DAFTAR PUSTAKA.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (316kB) | Preview |
|
Text (Full Text)
4. SKRIPSI-4204171164-FULL TEXT.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (11MB) |
Abstract
Community health centers (puskesmas) of course have various kinds of drugs that will be given to patients seeking treatment at the Meskom health center, Meskom health center. This is something that the meskom village community really needs. The purpose of this study was to determine the traffic performance on the main road section of the meskom village, the data used were data on the attraction of visitors to the meskom health center, and the volume of traffic on the main road in meskom village. Data collected using a survey method, road performance is measured using the 1997 standard MKJI, and the performance of these roads in the coming years was analized using regression The magnitude of the generation of the puskesmas is then charged to each road segment, after obtaining the volume of vehicles burdened by the generation, an analysis of the performance of the road segment is carried out. Traffic growth figures are used to predict conditions in the next 10 years. The results showed that the traffic volume on Monday (Monday) occurred at 09.00-10.00 WIB in the morning, which was 160 smp/hour, while in the afternoon it occurred at 16.00-17.00 WIB which was 172 smp/hour.. Traffic volume during the day (Sunday) occurs at 10.00-11.00 WIB in the morning, which is 167 pcu/hour, while in the afternoon occurs at 16.00-17.00 WIB, which is 192 pcu/hour. The capacity of the jl.Utama Desa Meskom section is 157,923 pcu/hour, the existing condition in 2021 the number of vehicle traffic is 8577 pcu/hour, and for the next 10 years in 2031 the traffic volume is 157,923 pcu/hour.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | Road traffic performance, MKJI 1997, trip generation and attraction. | ||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil | ||||||||
Divisions: | Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR | ||||||||
Depositing User: | TPJJ 2022 | ||||||||
Date Deposited: | 29 Aug 2022 09:55 | ||||||||
Last Modified: | 10 Jan 2023 11:15 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/5210 |
Actions (login required)
View Item |