IDENTIFIKASI ALINYEMEN HORIZONTAL (Studi Kasus : Jl. Bathin Alam Kabupaten Bengkalis)

Wahyuni, Sri (2022) IDENTIFIKASI ALINYEMEN HORIZONTAL (Studi Kasus : Jl. Bathin Alam Kabupaten Bengkalis). Undergraduate thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstrsct)
1. TA-4204181179-Abstrak.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (106kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2. TA-4204181179-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (111kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
3. TA-4204181179-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (160kB) | Preview
[img] Text (Full Text)
4. TA-4204181179-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (5MB)

Abstract

Road geometry is the planning of a complete road segment, including several elements that are adjusted to the completeness and basic data available or available from the results of field surveys and have been analyzed with a planning standard. Road geometry is focused on planning the physical form so as to produce safe infrastructure, efficient traffic services and economical implementation costs. Evaluation of this horizontal alignment uses the 2021 Road Geometric Design Guidelines. Data collection is done by taking secondary data and primary data. Based on this evaluation, the length of the existing road is known to have a terrain classification of flat area, a design speed of 40 km/hour and a road width of 4.9 meters. There are 5 bends with different types. From the results of the analysis and calculations on this road, alignment horizontal 2 and 4 have the type of Spiral circle spiral (S-C-S) and alignment horizontal 1,3,5 with the type of Full circle (F-C). Superelevation at alignment horizontal 1 (2%), alignment horizontal 2 (3.2%), alignment horizontal 3 (4.1%), alignment horizontal 4 (2.4%) and alignment horizontal 5 (3.5%).

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorBasir, Noerdinnoerdin@polbeng.ac.idNIDN1031037701
Uncontrolled Keywords: Horizontal alignment, spiral circle spiral, full circle
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR
Depositing User: TPJJ 2022
Date Deposited: 12 Sep 2022 10:45
Last Modified: 15 Sep 2022 16:43
URI: http://eprints.polbeng.ac.id/id/eprint/7157

Actions (login required)

View Item View Item