Perancangan Jalan Sultan Syarif Kasim Kelurahan Tanjung Kapal Menuju Desa Darul Aman Pada Km 7 – Km 9 Menggunakan Metode PDT NO 14 Tahun 2003

Syarifudin, Syarifudin (2023) Perancangan Jalan Sultan Syarif Kasim Kelurahan Tanjung Kapal Menuju Desa Darul Aman Pada Km 7 – Km 9 Menggunakan Metode PDT NO 14 Tahun 2003. Diploma thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
1.Skripsi-4204191230-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (27MB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2.Skripsi-4204191230-Bab 1 Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (27MB) | Preview
[img]
Preview
Text (Daftar Pustaka)
3.Skripsi-4204191230-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (27MB) | Preview
[img] Text (Full Text)
4.Skripsi-4204191230-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (26MB)

Abstract

Roads are the primary mean of transportation to reach a destination from one place to another espicially for the residents of Tanjung Kapal Village – Darul Aman. The existing condition of Sultan Syarif Kasim Road, which is the research location, consist of class B aggregate as the subbase with a width of 6 meters, which is damaged, at 250 m long, the road is flooded when the high tide reaches 50 cm. In the planning of the construction of rigid pavement on Sultan Syarif Kasim Road in Tanjung Kapal Village – Darul Aman Village, Bengkalis Regency the PDT method No.14-2003 is still used compared to other methods. Therefore, the author reviews, designs, and plans Sultan Syarif Kasim Road in Tanjung Kapal Village to obtain the desired pavement thickness and the required budget plan. After calculating the thickness of the rigid pavement using the PDT method No.14 – 2003, the result obtained is 200 mm or 20 cm. With the result, the flooded location will no longer experience flooding due to tidal fluctuations. The total budget required for the plan is Rp 18,913,760,000.00.

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorGuswandi, Guswandiguswandi@polbeng.ac.idNIDN1018088001
Uncontrolled Keywords: Rigid Pavement, PDT No. 14 of 2003, Road
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 429 Bidang Teknik Sipil Lain Yang Belum Tercantum
Divisions: Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR
Depositing User: D4 TPJJ A 2024
Date Deposited: 30 Aug 2023 21:54
Last Modified: 20 Sep 2024 02:52
URI: http://eprints.polbeng.ac.id/id/eprint/10285

Actions (login required)

View Item View Item