Hutasoit, Andre Pniel (2023) Perancangan Pembangkit Listrik Tenaga Surya Di Tambak Udang Menggunakan Sistem Hybrid. Undergraduate thesis, Politeknik Negeri Bengkalis.
|
Text (Abstract)
1.SKRIPSI-2204191215-Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (10kB) | Preview |
|
|
Text (Bab I Pendahuluan)
2.SKRIPSI-2204191215-Bab I Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (17kB) | Preview |
|
|
Text (Daftar Pustaka)
3.SKRIPSI-2204191215-Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (10kB) | Preview |
|
Text (Full Text)
4.SKRIPSI-2204191215-Full Text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (6MB) |
Abstract
The utilization of solar energy has become a primary focus in efforts to reduce dependence on depleting fossil energy sources. This research resulted in the design of a hybrid solar power plant system that meets the needs of the shrimp farming industry, especially during power outages, thus replacing the role of a generator as a backup power source. The potential solar radiation is 4.63 kWh/m2/day, and the total daily power consumption is 280.3 kWh. The design of this PLTS system uses PVsyst 7.2. From the calculations, it is known that the planned capacity of the hybrid solar power plant system will have a PV Array capacity of 76.7 kWp, 578 units of 12V 100Ah batteries, and 1 unit of a 100 kW grid-tied hybrid inverter. The initial investment to build the hybrid PLTS system is Rp.1.946.906.000, with annual operational and maintenance costs of Rp13.806.000. The Net Present Value (NPV) generated shows that the PLTS is more feasible than the generator, with a difference of Rp. 475.788.000
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | renewable energy ; solar power plant ; shrimp pond | ||||||||
Subjects: | 410 ILMU TEKNIK > 430 ILMU KETEKNIKAN INDUSTRI > 431 Teknik Mesin (dan Ilmu Permesinan Lain) 410 ILMU TEKNIK > 450 TEKNIK ELEKTRO DAN INFORMATIKA > 451 Teknik Elektro 410 ILMU TEKNIK > 450 TEKNIK ELEKTRO DAN INFORMATIKA > 452 Teknik Tenaga Elektrik |
||||||||
Divisions: | Jurusan Teknik Mesin > Sarjana Terapan Teknik Mesin Produksi dan Perawatan > TUGAS AKHIR | ||||||||
Depositing User: | TMPP TMPP | ||||||||
Date Deposited: | 14 Sep 2023 12:31 | ||||||||
Last Modified: | 14 Sep 2023 12:31 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/10743 |
Actions (login required)
View Item |