Analisa Pengaruh Penambahan Pipa Air dan Pipa Economizer pada Boiler Vertikal Pipa Api Kapasitas 100 Kg/Jam Terhadap Kapasitas Uap yang Dihasilkan

Gultom, Aprijal Putra Jaya (2024) Analisa Pengaruh Penambahan Pipa Air dan Pipa Economizer pada Boiler Vertikal Pipa Api Kapasitas 100 Kg/Jam Terhadap Kapasitas Uap yang Dihasilkan. Undergraduate thesis, Politeknik Negeri Bengkalis.

[img] Text (Abstract)
1. SKRIPSI-2204201232-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (266kB)
[img] Text (Bab I Pendahuluan)
2. Skripsi-2204201232-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (167kB)
[img] Text (Daftar Pustaka)
3. Skripsi-2204201232-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (265kB)
[img] Text (Full Text)
4. Skripsi-2204201232-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (5MB) | Request a copy

Abstract

The problem with this boiler is that during the distillation process, the steam produced is not continuous, with a pressure of 1 bar, the steam lasts for around 2 minutes, so the citronella distillation process is less than optimal. Apart from that, the boiler heating time is also quite long, namely 95 minutes to reach a temperature of 100°C. The aim of this research is to analyze its effect on heating time, steam retention time, fuel consumption and boiler efficiency. This research was conducted using quantitative methods with an experimental approach. The test results show that the heating duration before modification is 45 minutes, after adding the economizer 40 minutes, adding the water pipe 36 minutes, and after combining the water pipe and economizer 33 minutes. Steam resistance before modification was 4 minutes, after adding the economizer 2 minutes 62 seconds, with the addition of a water pipe without an economizer 4 minutes 42 seconds, and after combining the water pipe and economizer 5 minutes 20 seconds. Wood fuel consumption before modification was 33.2 kg, with the addition of the economizer 29.5 kg, the addition of the water pipe 27 kg, and after combining the water pipe and economizer 25.4 kg. The resulting efficiency before modification was 66.6%, after adding the economizer 69.8%, adding the water pipe 74.5%, and after combining the water pipe and economizer 81.7%.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorGafuf, Abdulabdulgafur@polbeng.ac.idNIM00230288
Uncontrolled Keywords: Boiler, water pipe boiler, economizer, fire pipe boiler
Subjects: 410 ILMU TEKNIK > 430 ILMU KETEKNIKAN INDUSTRI > 431 Teknik Mesin (dan Ilmu Permesinan Lain)
410 ILMU TEKNIK > 430 ILMU KETEKNIKAN INDUSTRI > 432 Teknik Produksi (dan Atau Manufakturing)
Divisions: Jurusan Teknik Mesin > Sarjana Terapan Teknik Mesin Produksi dan Perawatan > TUGAS AKHIR
Depositing User: TMPP TMPP
Date Deposited: 28 Aug 2024 02:29
Last Modified: 28 Aug 2024 02:29
URI: http://eprints.polbeng.ac.id/id/eprint/14237

Actions (login required)

View Item View Item