Analisis Resiko Kerusakan Pada Mesin Doosan Gv180 Ti Dengan Mengunakan Metodefmea Untuk Meningkatkan Kinerja Pemeliharaan Preventif 750 Running Hourspada Pltmg Pt. Bima Goldenpowerindo Site Melibur

Muharram, Abdul Wahid (2020) Analisis Resiko Kerusakan Pada Mesin Doosan Gv180 Ti Dengan Mengunakan Metodefmea Untuk Meningkatkan Kinerja Pemeliharaan Preventif 750 Running Hourspada Pltmg Pt. Bima Goldenpowerindo Site Melibur. Undergraduate thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstrak)
10.SKRIPSI-2204161107-ABSTRACT.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (282kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2.SKRIPSI-2204161107-BAB 1.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (94kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
7.SKRIPSI-2204161107-DAFTAR PUSTAKA.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (193kB) | Preview
[img] Text (Full Text)
9.SKRIPSI-2204161107-FULL TEXT.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (12MB) | Request a copy

Abstract

The reliability of a power plant is the ability of an equipment or electrical component to carry out its operating functions at certain time periods and operating conditions. So that it can produce electricity and be able to serve electricity supply to consumers. To support this reliability, decision support and risk analysis systems are used that can identify potential causes and impacts of damage to power plant components using FMEA. By using this system, the priority of equipment maintenance will be obtained based on the value of the RPN. High equipment reliability is obtained with planned maintenance support through preventive maintenance methods. Preventive performance and FMEA, measured based on performance targets set by the company. The results of the highest RPN value in PLTG namely valv in / exe (180) and sparklup (140) are expected to be the company's evaluation material to improve the reliability and appropriate risk treatment in operational activities of the power plant.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorRazali, Razalirazali@polbeng.ac.idNIDN1025127301
Uncontrolled Keywords: Risk analysis, FMEA, the performance, preventive maintenance
Subjects: 410 ILMU TEKNIK > 430 ILMU KETEKNIKAN INDUSTRI > 431 Teknik Mesin (dan Ilmu Permesinan Lain)
Divisions: Jurusan Teknik Mesin > Sarjana Terapan Teknik Mesin Produksi dan Perawatan > TUGAS AKHIR
Depositing User: Editor Perpustakaan
Date Deposited: 09 Jun 2021 10:24
Last Modified: 09 Jun 2021 10:24
URI: http://eprints.polbeng.ac.id/id/eprint/298

Actions (login required)

View Item View Item