Affandi, M. (2019) Analisa Dan Rancang Bangun Prototype Pembangkit Listrik Tenaga Mikro Hidro (Pltmh) Sebagai Media Praktikum Mahasiswa. Undergraduate thesis, Politeknik Negeri Bengkalis.
|
Text (Abstract)
SKRIPSI_3204151011_ ABSTRACT.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (88kB) | Preview |
|
|
Text (Bab I Pendahuluan)
SKRIPSI _3204151011_BAB I.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (47kB) | Preview |
|
|
Text (Daftar Pustaka)
SKRIPSI_3204151011_DAFTAR PUSTAKA.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (208kB) | Preview |
|
Text (Full Text)
SKRIPSI_3204151011_ FULL TEXT.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (5MB) | Request a copy |
Abstract
In this thesis the author will develop a new technology which is expected to produce new breakthroughs in utilizing renewable energy in Indonesia. This thesis aims to produce a prototype of a micro hydro power plant as a student practicum media. In this thesis the author uses water as a natural resource as a renewable energy for electricity generation. The technology that the author has developed in this thesis is only on a prototype scale. In this plant using pelton turbine type as a propulsion with a number of propulsion counters as many as 8 blades. With 8 drive blades capable of producing Pout power of 0.27 watts. Large value of the average voltage when not using a 1.54 volt load. Large value of the average voltage when using LEDs as a load of about 1.3 volts. The value of the current generated during testing using 3 volt LEDs as a load is 0.2 amperes. Gear ratios obtained based on calculations made were 2.27. The value of the speed of water discharge that comes out of the water pump to drive the turbine blade is 2.88 liters / second. The average efficiency value on this prototype micro hydro power plant is 1.36%.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | Energy, Water, Micro Hydro Power Plants, Prototype | ||||||||
Subjects: | 410 ILMU TEKNIK > 450 TEKNIK ELEKTRO DAN INFORMATIKA > 451 Teknik Elektro | ||||||||
Divisions: | Jurusan Teknik Elektro > Sarjana Terapan Teknik Listrik > TUGAS AKHIR | ||||||||
Depositing User: | Editor Perpustakaan | ||||||||
Date Deposited: | 20 Jul 2022 15:33 | ||||||||
Last Modified: | 20 Jul 2022 15:33 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/4334 |
Actions (login required)
View Item |