Hafizah, Hafizah (2022) Analysis of Supply Chain Management of Paper at PT. Indah Kiat Pulp & Paper Perawang. Undergraduate thesis, Politeknik Negeri Bengkalis.
|
Text (Abstract)
SKRIPSI-5404181135-Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (153kB) | Preview |
|
|
Text (Chapter I Introduction)
SKRIPSI-5404181135-Bab I Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (276kB) | Preview |
|
|
Text (References)
SKRIPSI-5404181135-Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (159kB) | Preview |
|
Text (Full Text)
SKRIPSI-5404181135-Full Text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (2MB) | Request a copy |
Abstract
This study aims to determine the flow of supply chain management, obstacles during the supply chain process, and solutions taken when supply chain bottlenecks occur on paper at PT. IKPP. This research uses a descriptive method. Data collection techniques are interviews and documentation. The object of research is PT. Indah Kiat Pulp & Paper Tbk-Perawang Mill. The result of this research is supply chain management at PT. IKPP has three process flows consisting of Order Process, Production Planning Process, and Logistics Process. Obstacles to the supply chain process are late orders, excess incoming capacity or allocation and not in accordance with the specified sales budget, length of the container drawing calculation process, system error, incomplete information, length of time for orders to be confirmed as sales confirmations, late payments received, outstanding debts unpaid, overlimit, unrealized credit block, unavailable packaging, customer decel not in accordance with paper machine mill, quality issue, insufficient trucking, unavailable container, unavailable space, lack of tools when stuffing. The solutions implemented are reminders to related parties, mentioning contracts, collaborating with IT for system errors, reviewing and conducting meetings, negotiating for block schedule reservations, forecasting to provide Safety Stock, booking space, collaborating with parties whose forklifts can lent.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | Supply Chain Management | ||||||||
Subjects: | 550 ILMU EKONOMI > 570 ILMU MANAJEMEN > 571 Manajemen 550 ILMU EKONOMI > 570 ILMU MANAJEMEN > 579 Bidang Manajemen Yang Belum Tercantum |
||||||||
Divisions: | Jurusan Administrasi Bisnis > Sarjana Terapan Administrasi Bisnis Internasional > TUGAS AKHIR | ||||||||
Depositing User: | Adminitrasi Bisnis Internasional A | ||||||||
Date Deposited: | 22 Aug 2022 11:37 | ||||||||
Last Modified: | 22 Aug 2022 11:37 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/4686 |
Actions (login required)
View Item |