Agustiani, Nur (2022) Perencanaan Tebal Perkerasan Kaku Menggunakan Metode Bina Marga 2003 Dan Metode Bina Marga 2017. Undergraduate thesis, Politeknik Negeri Bengkalis.
|
Text (Abstrak)
SKRIPSI-4204181192-Abstrak.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (244kB) | Preview |
|
|
Text (Bab 1 Pendahuluan)
SKRIPSI-4204181192-Bab 1.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (420kB) | Preview |
|
|
Text (Daftar Pustaka)
SKRIPSI-4204181192-Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (243kB) | Preview |
|
Text (Full Text)
SKRIPSI-4204181192-Full Text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (17MB) | Request a copy |
Abstract
The Pulau Rupat causeway is in an uncomfortable condition with holes and dust flying along 1.800 meters on Jalan Subrantas Kelurahan Pergam, which is caused by the absence of adequate road pavement and until now the road surface is still in the form of a base layer. In order to provide additional reference information for future pavement thickness planning, the differences in effectiveness between two methods were analyzed by the Bina Marga 2003 method and Bina Marga 2017 method. The results of the planning calculations show that the thickness of the concrete slab with the K-450 quality for the Bina Marga 2003 method and the K-300 quality for the Bina Marga 2017 are 300 mm and 200 mm, respectively. The longitudinal reinforcement used in the Bina Marga 2003 method has a diameter of 8 mm and a distance of 200 mm and transverse reinforcement with a diameter of 8 mm and a distance of 250 mm with a planned budget of Rp. 14,562,640,000.00. Meanwhile, for Bina Marga 2017 used longitudinal reinforcement with a diameter of 8 mm and a distance of 250 mm and transverse reinforcement with a diameter of 8 mm and a distance of 250 mm with a planned budget of Rp. 16,293,830,000.00. The analysis using the Bina Marga 2003 method is considered more effective than the Bina Marga 2017 method.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | Key Word: Rigid Pavement, Bina Marga 2003, Bina Marga 2017 | ||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 429 Bidang Teknik Sipil Lain Yang Belum Tercantum | ||||||||
Divisions: | Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR | ||||||||
Depositing User: | TPJJ 2022 | ||||||||
Date Deposited: | 19 Sep 2022 11:40 | ||||||||
Last Modified: | 19 Sep 2022 11:40 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/7250 |
Actions (login required)
View Item |