Estimasi Biaya Konstruksi Menggunakan Metode Analisis Harga Satuan Pekerjaan Pada Proyek Swakelola Pemeliharaan Jalan (Studi Kasus Cv. Iwin Consultant)

Sinarti, Yusrita (2025) Estimasi Biaya Konstruksi Menggunakan Metode Analisis Harga Satuan Pekerjaan Pada Proyek Swakelola Pemeliharaan Jalan (Studi Kasus Cv. Iwin Consultant). Other thesis, Politeknik Negeri Bengkalis.

[thumbnail of Abstract] Text (Abstract)
1. TA-5304211366-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (313kB)
[thumbnail of Bab I Pendahuluan] Text (Bab I Pendahuluan)
2. TA-5304211366-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (422kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
3. TA-5304211366-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (340kB)
[thumbnail of Full Text] Text (Full Text)
4. TA-5304211366-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (3MB) | Request a copy

Abstract

This study aims to determine the application of the Analysis of Unit Price of Work (AHSP) method in the cost estimation process on road maintenance project managed by CV. Iwin Consultant, the causes of cost overruns on construction projects and the success rate of the unit price of work method in overcoming cost estimation inaccuracies in road construction projects managed by CV. Iwin Consultant. The type of data used in this research is Qualitative Descriptive data. Research data obtained from CV. Iwin Consultant. Data collection techniques in this study are interviews, observation and documentation. Research results showed that the AHSP method was able to provide a more detailed and realistic cost estimate through analysis of material costs, labor, work duration, and overhead costs. Cost overruns are generally caused by external factors such as weather, fluctuations in material prices, and labor uncertainty. However, the application of AHSP proved to be quite effective in minimizing the risk of cost overruns and improving efficiency in the cost estimation process of road projects.

Item Type: Thesis (Other)
Uncontrolled Keywords: Construction Cost Estimation, AHSP, Self-Managed Project, Maintenance Road.
Subjects: 600 – ILMU TEKNIK DAN ILMU TERAPAN > 650 – Manajemen dan Administrasi Bisnis > 657 – Akuntansi > 657.6 – Akuntansi Biaya (Cost Accounting)
600 – ILMU TEKNIK DAN ILMU TERAPAN > 624 – Teknik Sipil dan Konstruksi > 624.4 – Konstruksi Jalan dan Jalan Raya
Divisions: Jurusan Administrasi Niaga > Sarjana Terapan (D-IV) Akuntansi Keuangan publik > SKRIPSI
Depositing User: D-IV Akuntansi Keuangan Publik Kelas A
Date Deposited: 11 Aug 2025 06:19
Last Modified: 11 Aug 2025 06:19
URI: https://eprints.polbeng.ac.id/id/eprint/1261

Actions (login required)

View Item
View Item