Analisis Biaya Siklus Hidup (Lcc) Bangunan Pabrik (Studi Kasus Pabrik Cfa Animal Feeds Plant Pt. Sari Dumai Oleo, Dumai, Riau)

Artika, Ulan Windi (2025) Analisis Biaya Siklus Hidup (Lcc) Bangunan Pabrik (Studi Kasus Pabrik Cfa Animal Feeds Plant Pt. Sari Dumai Oleo, Dumai, Riau). Diploma thesis, Politeknik Negeri Bengkalis.

[thumbnail of Abstract] Text (Abstract)
TA-4103221475-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (717kB)
[thumbnail of Bab I Pendahuluan] Text (Bab I Pendahuluan)
TA-4103221475-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (706kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
TA-4103221475- Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (562kB)
[thumbnail of Full Tetx] Text (Full Tetx)
TA-4103221475-Full Text234.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (11MB) | Request a copy

Abstract

This study analyzes the Life Cycle Cost (LCC) of the CFA Animal Feeds factory building owned by PT. Sari Dumai Oleo in Dumai City over a 50-year service life. The main objective is to identify all cost components and calculate the total life cycle cost of the building. The components analyzed include initial construction costs, operational costs (electricity and wages), routine maintenance, component replacement, and demolition costs. The analysis uses the Net Present Value (NPV) method, taking into account an inflation rate of 4.59% and a discount rate (WACC) of 11.78%. The results show that the initial construction cost is Rp33,532,754,459.55. Operational costs are the largest component at Rp732,742,079,509.41. Maintenance costs amount to Rp8,453,148,329.82, replacement costs are Rp43,872,399,511.43, and demolition costs at the end of the building’s life are Rp2,872,399,511.34. In total, the life cycle cost of the CFA Animal Feeds factory building over 50 years is Rp781,289,144,138.81. These findings provide a comprehensive overview of the long-term cost burden that must be considered in industrial building management. Through LCC analysis, companies can develop more efficient and sustainable budgeting strategies, serving as a foundation for long-term investment decisions. This study is expected to be a valuable reference for management and investors in evaluating the economic feasibility of building and operating industrial facilities.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Life cycle cost, Net present value, Discount rate, Industrial building, CFA animal feeds
Subjects: 600 – ILMU TEKNIK DAN ILMU TERAPAN > 624 – Teknik Sipil dan Konstruksi > 624.9 – Perawatan dan Pemeliharaan Bangunan
Divisions: Jurusan Teknik Sipil > Diploma Tiga (D-III) Teknik Sipil > TUGAS AKHIR
Depositing User: D-III Teknik Sipil B 2022
Date Deposited: 14 Aug 2025 01:23
Last Modified: 14 Aug 2025 01:23
URI: https://eprints.polbeng.ac.id/id/eprint/1530

Actions (login required)

View Item
View Item