Faktor Penyebab Keterlambatan Proses Bongkar Bauksit Di Pelbuhan Tuks Pt.Bintan Alumina Indonesia

Syahdan, Akmal (2025) Faktor Penyebab Keterlambatan Proses Bongkar Bauksit Di Pelbuhan Tuks Pt.Bintan Alumina Indonesia. Diploma thesis, Politeknik Negeri Bengkalis.

[thumbnail of Abstrak] Text (Abstrak)
TA - 81031221252 - Abstrak.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (156kB)
[thumbnail of Bab 1 Pendahuluan] Text (Bab 1 Pendahuluan)
TA - 8103221252 - Bab 1 Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (413kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
TA - 8103221252 - Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (208kB)
[thumbnail of Full Text] Text (Full Text)
TA - 8103221252 - Full Text.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (4MB)

Abstract

This final project aims to determine the delay in thebauxite unloading process at Tukas Port of PT. Bintan Alumina Indonesia is a problem that often occurs and has animpact on the efficiency and productivity of the company. This study aims to providedirection in taking steps in accordance with the purpose of the study. The objectives thatthe author wants to achieve in this study are. To find out the implementation of bauxite unloading at PT. Bintan Alumina Indonesia, to find out the factors causing delays in the
bauxite unloading process at the Special Terminal (TUKS) port of PT. Bintan Alumina Indonesia, to find out what solutions can be done to avoid delays in the bauxite unloading process at the Special Terminal (TUKS) port of PT. Bintan Alumina Indonesia. The results of the study indicate that the factors causing delays in the bauxite unloading process are the presence of very wet cargo, half-wet cargo, lack of unloading equipment at the port,bad weather, lack of port capacity, overload at the bauxite cargo storage area and the occurrence of queues due to waiting for foreign ships carrying important cargo for PT. Bintan Alumina Indonesia. This research is expected to contribute to improving the efficiency and productivity of the bauxite unloading process at PT. Bintan Alumina Indonesia's Tuks Port. The author used qualitative data collection techniques, includinginterviews, documentation, and observation.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Delay, Unloading process, Bauxit
Subjects: 600 – ILMU TEKNIK DAN ILMU TERAPAN > 623.8 – Kapal dan Teknik Perkapalan > 623.88 Teknologi Pelabuhan, Kapal Selam, dan Dermaga
Divisions: Jurusan Kemaritiman > Diploma Tiga (D-III) Ketatalaksanaan Pelayaran Niaga > TUGAS AKHIR
Depositing User: D-III Ketatalaksanaan Pelayaran Niaga Kelas A
Date Deposited: 15 Aug 2025 03:48
Last Modified: 15 Aug 2025 03:48
URI: https://eprints.polbeng.ac.id/id/eprint/1576

Actions (login required)

View Item
View Item