Nabila, Hasna (2025) Analisa Harga Satuan Biaya Alat Berat Berbasis Produktivitas Harian Proyek (Studi Kasus Temporary Jetty Pt. Oleokimia Sejahtera Mas, Dumai). Diploma thesis, Politeknik Negeri Bengkalis.
![[thumbnail of Abstract]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
TA-4103221476-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.
Download (280kB)
![[thumbnail of Bab I Pendahuluan]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
TA-4103221476-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.
Download (267kB)
![[thumbnail of Daftar Pustaka]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
TA-4103221476-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.
Download (240kB)
![[thumbnail of Full Text]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
TA-4103221476-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.
Download (2MB) | Request a copy
Abstract
The use of heavy equipment in construction projects significantly affects the efficiency of time, cost, and work quality. This study aims to analyze the unit cost of heavy equipment operations based on daily productivity in the temporary jetty construction project at PT. Oleokimia Sejahtera Mas, Dumai. The equipment examined includes an excavator, vibrator roller, and dump truck. Based on the calculation results, the unit cost per m³ is as follows: excavator at Rp 92,594.116, vibrator roller at Rp 13,182.325, and dump truck at Rp 14,826.666. These costs were calculated based on actual field productivity and the components of ownership and operational costs. The study also identifies that productivity is highly influenced by site conditions, operator skills, and equipment performance. This research is expected to serve as a reference for similar projects in coastal areas with challenging ground conditions.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Dump truck, Excavator, Productivity, Unit cost, Vibratory roller. |
Subjects: | 600 – ILMU TEKNIK DAN ILMU TERAPAN > 624 – Teknik Sipil dan Konstruksi > 624.2 – Struktur Bangunan dan Material 600 – ILMU TEKNIK DAN ILMU TERAPAN > 624 – Teknik Sipil dan Konstruksi > 624.6 – Teknik Geoteknik dan Fondasi 600 – ILMU TEKNIK DAN ILMU TERAPAN > 624 – Teknik Sipil dan Konstruksi > 624.3 – Konstruksi Jembatan dan Terowongan |
Divisions: | Jurusan Teknik Sipil > Diploma Tiga (D-III) Teknik Sipil > TUGAS AKHIR |
Depositing User: | D-III Teknik Sipil B 2022 |
Date Deposited: | 14 Aug 2025 09:13 |
Last Modified: | 14 Aug 2025 09:13 |
URI: | https://eprints.polbeng.ac.id/id/eprint/1585 |