Sistem Estimasi Biaya Pengembangan Perangkat Lunak Menggunakan Metode Function Points Berbasis Website

Fitria, Khafifah Rizka (2025) Sistem Estimasi Biaya Pengembangan Perangkat Lunak Menggunakan Metode Function Points Berbasis Website. Other thesis, Politeknik Negeri Bengkalis.

[thumbnail of Abstract] Text (Abstract)
TA-6304211360-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (164kB)
[thumbnail of Bab I Pendahuluan] Text (Bab I Pendahuluan)
TA-6304211360-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (271kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
TA-6304211360-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (299kB)
[thumbnail of Full Text] Text (Full Text)
TA-6304211360-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (2MB) | Request a copy

Abstract

Software development cost estimation is a crucial aspect of software project management. Accurate estimation can help organizations allocate resources, determine project feasibility, and avoid financial risks. This study aims to develop a website-based software development cost estimation system using the Function Points method. This method enables more accurate cost calculations by measuring the complexity of functions within the software. The case study for this research is the Village-Owned Enterprise (BUMDes) information system, which requires a system to improve operational efficiency and transparency in village business management. The developed system has key features, such as project data input, Crude Function Points (CFP) calculation, Relative Complexity Adjustment Factor (RCAF), programming language selection, and automatic cost estimation. Testing using the Black Box Testing method shows that the system runs well and meets user needs. With this system, it is expected that the software project planning process will become more efficient and the risk of overbudgeting can be minimized.

Item Type: Thesis (Other)
Uncontrolled Keywords: Cost estimation, Function Points, software development, BUMDes, web-based systems
Subjects: 000 – UMUM, ILMU KOMPUTER, DAN INFORMASI > 005 – Pemrograman, Perangkat Lunak > 005.3 Perangkat Lunak (Software)
Divisions: Jurusan Teknik Informatika > Sarjana Terapan (D-IV) Rekayasa Perangkat Lunak > SKRIPSI
Depositing User: D-IV Rekayasa Perangkat Lunak Kelas B
Date Deposited: 18 Aug 2025 08:37
Last Modified: 18 Aug 2025 08:37
URI: https://eprints.polbeng.ac.id/id/eprint/1895

Actions (login required)

View Item
View Item