Setiawan, Deri (2025) Perencanaan Sirkulasi Arus Lalu Lintas Pelabuhan Roro Tanjung Kapal. Diploma thesis, Politeknik Negeri Bengkalis.
![[thumbnail of Absract]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
1 TA-4204211373-ABSTRAK.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.
Download (453kB)
![[thumbnail of Bab I Pendahuluan]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
2. TA-4204211373-BAB 1 PENDAHULUAN.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.
Download (234kB)
![[thumbnail of Daftar Pustaka]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
3. TA-4204211373-DAFTAR PUSTAKA.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.
Download (345kB)
![[thumbnail of Full Text]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
4. TA-4204211373-FULL TEXT.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.
Download (3MB) | Request a copy
Abstract
Tanjung Kapal Roro Port on Rupat Island is the main crossing terminal to Dumai. The current traffic circulation conditions are not organized, with a mixed flow of crossing vehicles, delivery/pick-up, and pedestrians, causing congestion and delays. This plan aims to design an efficient circulation system through traffic volume survey, SRP-based parking capacity analysis, and level of service (ρ) evaluation. Peak traffic reaches 90 vehicles/hour. The parking lot is sufficient in size, but not functionally organized. The average service time is 0.44 minutes (cars) and 0.23 minutes (motorcycles), with waiting times of up to 34.5 minutes. The ρ values are mostly <1, but are close to saturation during peak hours. Separating vehicle lanes, clear parking zoning, dedicated pedestrian paths, and additional signage and traffic control are recommended.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Ferry port, Parking, Queuing analysis. |
Subjects: | 600 – ILMU TEKNIK DAN ILMU TERAPAN > 624 – Teknik Sipil dan Konstruksi > 624.4 – Konstruksi Jalan dan Jalan Raya |
Divisions: | Jurusan Teknik Sipil > Sarjana Terapan (D-IV) Teknik Perancangan Jalan dan Jembatan > SKRIPSI |
Depositing User: | D-IV TPJJ A 2021 |
Date Deposited: | 21 Aug 2025 13:39 |
Last Modified: | 21 Aug 2025 13:39 |
URI: | https://eprints.polbeng.ac.id/id/eprint/2175 |