Faktor Penyebab Keterlambatan Bongkar Muat Palm Kernel expeller (PKE) Di Pelabuhan IBP lubuk Gaung Dumai oleh PT. Jasa Kargo Perkasatama

Rozi, Farhan Fahrul (2025) Faktor Penyebab Keterlambatan Bongkar Muat Palm Kernel expeller (PKE) Di Pelabuhan IBP lubuk Gaung Dumai oleh PT. Jasa Kargo Perkasatama. Diploma thesis, Politeknik Negeri Bengkalis.

[thumbnail of Abstract] Text (Abstract)
1. TA-8303221277-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (231kB)
[thumbnail of Bab 1 Pendahuluan] Text (Bab 1 Pendahuluan)
2. TA-8303221264-Bab 1 Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (368kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
3. TA-8303221264-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (189kB)
[thumbnail of Full Text] Text (Full Text)
4. TA-8303221264-Full Text 2121 .pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (3MB) | Request a copy

Abstract

The problem in this research is related to how the mechanism of the loading and unloading process of palm kernel expeller and the factors causing delays in loading and unloading to the efforts made to overcome the delays in the loading and unloading process of palm kernel expeller. This research uses observation, interview, and documentation data collection methods. The location of this research is located at the Inti Benua Perkasatama Port. The results of this study indicate that the preparation and notification stages of the ship's arrival, including document checking and schedule coordination between port operators, ship agents, and loading and unloading companies, repair and routine maintenance of loading and unloading equipment so that it is always ready for use. With this process, it will reduce delays in loading and unloading of palm kernel expeller (PKE), while the factors causing delays in loading and unloading are human error factors caused by human error in carrying out a job, technical operational constraints in inadequate equipment failure, then efforts made to overcome delays in the loading and unloading process consist of repair and routine maintenance of loading and unloading equipment so that it is always ready for use, Preparation of a more coordinated work schedule and shift system to reduce labor fatigue, Technical and K3 training for crews to minimize human error

Item Type: Thesis (Diploma)
Uncontrolled Keywords: delay, Palm Kernel Expeller, Loading and Unloading
Subjects: 600 – ILMU TEKNIK DAN ILMU TERAPAN > 623.8 – Kapal dan Teknik Perkapalan > 623.88 Teknologi Pelabuhan, Kapal Selam, dan Dermaga
600 – ILMU TEKNIK DAN ILMU TERAPAN > 623.8 – Kapal dan Teknik Perkapalan > 623.86 Penanganan dan Pemuatan Kapal
Divisions: Jurusan Kemaritiman > Diploma Tiga (D-III) Ketatalaksanaan Pelayaran Niaga > TUGAS AKHIR
Depositing User: D-III Ketatalaksanaan Pelayaran Niaga Kelas B
Date Deposited: 22 Aug 2025 10:02
Last Modified: 22 Aug 2025 10:02
URI: https://eprints.polbeng.ac.id/id/eprint/2229

Actions (login required)

View Item
View Item