Perawatan Preventif pada Pompa Sentrifugal Menggunakan Metode Failure Mode and Effect Analysis (FMEA) di PERUMDA Air Minum Tirta Terubuk Bengkalis

Akbar, Khori (2025) Perawatan Preventif pada Pompa Sentrifugal Menggunakan Metode Failure Mode and Effect Analysis (FMEA) di PERUMDA Air Minum Tirta Terubuk Bengkalis. Other thesis, Politeknik Negeri Bengkalis.

[thumbnail of Abstract] Text (Abstract)
1. TA-2204211312-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (124kB)
[thumbnail of Bab I Pendahuluan] Text (Bab I Pendahuluan)
2. TA-2204211312-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (78kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
3. TA-2204211312-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (133kB)
[thumbnail of Full Text] Text (Full Text)
4. TA-2204211312-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (2MB) | Request a copy

Abstract

Centrifugal pumps play a vital role in the clean water distribution system at Perumda Air Minum Tirta Terubuk Bengkalis. This study was conducted to identify potential failures and determine preventive maintenance priorities using the Failure Mode and Effect Analysis (FMEA) method. The assessment was carried out by evaluating the severity, occurrence, and detection levels of each pump component. The analysis results showed that the impeller had the highest Risk Priority Number (RPN) of 684, caused by cavitation and the ingress of sludge or debris into the system. Bearings and mechanical seals ranked next with an RPN value of 288, while couplings, shafts, and casings had lower RPN values ranging from 84 to 94. Based on preventive maintenance interval calculations, distribution pumps IPAC 1 and IPAC 2 require servicing every 50–62 days, IPAC 3 every 70– 83 days, and the IPAB pump, which operates for longer hours, requires maintenance every 20 days. For intake pumps, the preventive maintenance interval was calculated to be approximately every 21 days. The findings of this study emphasize the importance of implementing regular maintenance to prevent major damage, especially for components with high RPN values. Recommended actions include replacing damaged parts, performing routine inspections of pump conditions, and improving technicians’ skills through training programs.

Item Type: Thesis (Other)
Uncontrolled Keywords: Centrifugal pump, preventive maintenance, FMEA
Subjects: 600 – ILMU TEKNIK DAN ILMU TERAPAN > 620 – Teknik Mesin dan Teknik Industri > 620 – Teknik Mesin dan Teknik Industri > 620.1 Properti Teknik dan Desain Teknik
600 – ILMU TEKNIK DAN ILMU TERAPAN > 620 – Teknik Mesin dan Teknik Industri > 620 – Teknik Mesin dan Teknik Industri > 620.2 Mesin dan Peralatan Mesin
600 – ILMU TEKNIK DAN ILMU TERAPAN > 620 – Teknik Mesin dan Teknik Industri > 620 – Teknik Mesin dan Teknik Industri > 620.3 Mekanika Fluida
Divisions: Jurusan Teknik Mesin > Sarjana Terapan (D-IV) Teknik Mesin Produksi dan Perawatan > SKRIPSI
Depositing User: D-IV TMPP Kelas A 2021
Date Deposited: 21 Aug 2025 09:05
Last Modified: 21 Aug 2025 09:05
URI: https://eprints.polbeng.ac.id/id/eprint/2524

Actions (login required)

View Item
View Item