Analisa Percepatan Waktu Pelaksanaan Proyek Ruang Tunggu Pelabuhan Penyebrangan Roro-Roro Air Putih Dengan Metode Fast-Track

Tulada, Muhammad Yanniko (2024) Analisa Percepatan Waktu Pelaksanaan Proyek Ruang Tunggu Pelabuhan Penyebrangan Roro-Roro Air Putih Dengan Metode Fast-Track. Diploma thesis, Politeknik Negeri Bengkalis.

[thumbnail of Abstract] Text (Abstract)
1. TA-4103211400-Abstrak.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (108kB)
[thumbnail of Bab I Pendahuluan] Text (Bab I Pendahuluan)
2. TA-4103211400-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (245kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
3. TA-4103211400-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (224kB)
[thumbnail of Full Text] Text (Full Text)
4. TA-4103211400-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (5MB)

Abstract

The Air Putih Ro-Ro Ferry Port Waiting Room Construction Project in Bengkalis is an effort to improve passenger service facilities and port operational efficiency. However, project implementation with conventional methods often experiences obstacles in time efficiency, so an alternative approach is needed. This study aims to analyze the effectiveness of the fast-track method in accelerating project implementation time compared to conventional methods. This study uses the Microsoft Project application to simulate project scheduling with the fast-track method. Primary data in the form of work duration, Cost Budget Plan (RAB), and time schedule were analyzed to compare the duration and efficiency between the two methods. The results showed that the application of the fast-track method was able to accelerate the project completion time from 17 calendar weeks to 13 calendar weeks, or a time saving of 23.53%. The result obtained through this final project is that the fast track method can provide savings in project duration, overall. However, it should also be noted that fast-track also has other effects such as changes in resource allocation during the project.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Fast-Track, Microsoft Project, Duration
Subjects: 600 – ILMU TEKNIK DAN ILMU TERAPAN > 624 – Teknik Sipil dan Konstruksi > 624.1 – Perencanaan dan Desain Bangunan
Divisions: Jurusan Teknik Sipil > Diploma Tiga (D-III) Teknik Sipil > TUGAS AKHIR
Depositing User: D-III Teknik Sipil B 2022
Date Deposited: 27 Aug 2025 03:24
Last Modified: 27 Aug 2025 03:24
URI: https://eprints.polbeng.ac.id/id/eprint/2715

Actions (login required)

View Item
View Item