Shely, Sabrina (2021) Dampak Pembangunan Spbu Terhadap Kinerja Lalu Lintas. Undergraduate thesis, Politeknik Negeri Bengkalis.
|
Text (Abstract)
1. SKRIPSI-4204171158-Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (300kB) | Preview |
|
|
Text (BAB I Pendahuluan)
2. SKRIPSI-4204171158-BAB I Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (156kB) | Preview |
|
|
Text (Daftar Pustaka)
3. SKRIPSI-4204171158-Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (144kB) | Preview |
|
Text (Full Text)
4. SKRIPSI-4204171158-Full Text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (7MB) |
Abstract
Changes in land use, both changes in category and intensity will generate traffic so that small or large will have an influence on the surrounding traffic. As a result of the construction of this gas station, it will certainly cause a change in the pattern of vehicle circulation at the location of the gas station construction. This study aims to determine the impact of traffic that occurs due to the construction of gas stations on read performance. To anticipate the occurrence of a fairly large traffic effect on the transportation network around the development, it is necessary to study the impact of traffic performance. The materials used to support this research are the 2014 Indonesian Road Capacity Guidelines (PKJI 2014) and the Indonesia Road Capacity Manual (MKJI 1997). This study aims to determine the impact of traffic that occurs due to the operation of gas stations around the construction of Jalan Jendral Sudriman Sei. Selari. Based on the current ratio between current and capacity, the value of the degree of saturation on holidays (Saturday) is 0.30. and the value of the degree of saturation on weekdats (Monday) is 0.22 <0.35. the campact gas station is included in the conventional gas station with an area of 1000-1200 m2 with an estimated visitor of 400-600 vehicles/hour, so the generation and pull are obtained with service leveks A, DS ,0,35 with free traffic conditions.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | Traffic performance, Degree of saturation, Pull Generation | ||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 424 Perencanaan Wilayah dan Kota |
||||||||
Divisions: | Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR | ||||||||
Depositing User: | Users 321 not found. | ||||||||
Date Deposited: | 12 Oct 2021 15:13 | ||||||||
Last Modified: | 12 Oct 2021 15:13 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/2271 |
Actions (login required)
View Item |