PERENCANAAN TEBAL PERKERASAN KAKU (Studi Kasus: Pos Retribusi Terminal Angkutan Barang Rawa Panjang)

Anand, Muhammad Rhestu (2022) PERENCANAAN TEBAL PERKERASAN KAKU (Studi Kasus: Pos Retribusi Terminal Angkutan Barang Rawa Panjang). Undergraduate thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
1. TA-4204181188-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (433kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2. TA-4204181188-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (535kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
3. TA-4204181188-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (334kB) | Preview
[img] Text (Full Text)
4. TA-4204181188-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (26MB)

Abstract

The Dumai City Government plans to build three retribution posts on entry and exit routes to Dumai City, one of which is located on Jalan Soekarno – Hatta, Bukit Kayu Kapur Village. In this retribution post there will be postal buildings, parking lots, road pavements, and traffic circulation, the Dumai City Government's goal in building the retribution post is as a form of improving performance facilities and as a temporary stop for vehicles that will carry out the retribution process so that later no more vehicles stopping on the road. Based on the above problems, it is necessary to plan the thickness of the pavement in the area of the retribution post, considering that the vehicles that will pass the pavement in the area of the retribution post are vehicles that have a heavy load (overload), the pavement to be planned is rigid pavement. Based on the results of the calculation of LHR and CBR the existing condition was found to be 12% so that the thickness of the pavement design using the Pd T-14-2003 method was 250 mm with a budget of Rp. 2.635.389.673.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorIdham, MuhammadIdham@polbeng.ac.idNIDN0007098401
Uncontrolled Keywords: Post Retribution, Pd T-14-2003, LHR, CBR
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR
Depositing User: TPJJ 2022
Date Deposited: 26 Sep 2022 09:51
Last Modified: 10 Jan 2023 10:22
URI: http://eprints.polbeng.ac.id/id/eprint/7398

Actions (login required)

View Item View Item