Perbaikan Motor Induksi 3 Fasa 900-06-P3-A Water Treatment Plan (WTP) Area Utilities PT. Kilang Pertamina Internasional Refinery Unit Ii Dumai Production Sungai Pakning

Hakim, Muhammad Lukman (2023) Perbaikan Motor Induksi 3 Fasa 900-06-P3-A Water Treatment Plan (WTP) Area Utilities PT. Kilang Pertamina Internasional Refinery Unit Ii Dumai Production Sungai Pakning. [Experiment] (Unpublished)

[img]
Preview
Text (Cover-Daftar Isi)
KP-3103211291-Cover-Daftar Isi.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (352kB) | Preview
[img]
Preview
Text (BAB I Pendahuluan)
KP-3103211291-BAB I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (283kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
KP-3103211291-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (87kB) | Preview
[img]
Preview
Text (Full Text)
KP-3103211291-Full Text.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (3MB) | Preview
Item Type: Experiment
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorAmri, Hikmatulhikmatul_amri@polbeng.ac.idNIDN0006038802
Subjects: 410 ILMU TEKNIK > 450 TEKNIK ELEKTRO DAN INFORMATIKA > 451 Teknik Elektro
410 ILMU TEKNIK > 450 TEKNIK ELEKTRO DAN INFORMATIKA > 452 Teknik Tenaga Elektrik
410 ILMU TEKNIK > 450 TEKNIK ELEKTRO DAN INFORMATIKA > 454 Teknik Elektronika
Divisions: Jurusan Teknik Elektro > Diploma Tiga Teknik Elektro > LAPORAN KERJA PRAKTEK
Depositing User: TEKNIK ELEKTRONIKAB ELEKTRONIKA B
Date Deposited: 24 Oct 2023 12:35
Last Modified: 24 Oct 2023 12:35
URI: http://eprints.polbeng.ac.id/id/eprint/11070

Actions (login required)

View Item View Item