Ilhan, Ilhan (2025) Perencanaan Perbaikan Jalan Pada Perkerasan Lentur (Studi Kasus: Jalan Jend. Sudirman – Jalan Arifin Ahmad Sta 0+000 – Sta 30+000 Kecamatan Bukit Batu Kabupaten Bnegkalis). Other thesis, Politeknik Negeri Bengkalis.
![[thumbnail of Abstract]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
1. TA-4204211386-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.
Download (184kB)
![[thumbnail of Bab I Pendahuluan]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
2. TA-4204211386-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.
Download (83kB)
![[thumbnail of Daftar Pustaka]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
3. TA-4204211386-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.
Download (8kB)
![[thumbnail of Full Text]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
4. TA-4204211386-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.
Download (9MB)
Abstract
This research aims to plan road rehabilitation for flexible pavement with a case study on Jend. Sudirman – Arifin Ahmad Road, Bukit Batu District, Bengkalis Regency. The study was carried out through a visual survey and data analysis using the Bina Marga method and the Surface Distress Index (SDI) to assess pavement condition and determine the required treatment. The observed types of damage include alligator cracking, potholes, depressions, rutting, and patches. The Average Daily Traffic (ADT) of 4,660 vehicles/day places the road into a high traffic class (class 5). The assessment results show that most segments are in fair to good condition, while some require periodic maintenance and upgrading. The average Priority Order (UP) value of 9 indicates that routine maintenance is recommended. Furthermore, based on SDI values, several segments are categorized as slightly to moderately damaged.
The rehabilitation plan emphasizes patching as the main method to effectively repair localized damage. A Budget Plan (RAB) was prepared to support the implementation, with a total cost of IDR 501,622,744. The findings of this study are expected to provide useful references for local governments in planning more effective and targeted road maintenance programs.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Road Damage, Flexible Pavement, Bina Marga, SDI, Patching, Budget Plan |
Subjects: | 600 – ILMU TEKNIK DAN ILMU TERAPAN > 624 – Teknik Sipil dan Konstruksi > 624.4 – Konstruksi Jalan dan Jalan Raya |
Divisions: | Jurusan Teknik Sipil > Sarjana Terapan (D-IV) Teknik Perancangan Jalan dan Jembatan > SKRIPSI |
Depositing User: | D-IV TPJJ A 2021 |
Date Deposited: | 01 Sep 2025 08:51 |
Last Modified: | 01 Sep 2025 08:51 |
URI: | https://eprints.polbeng.ac.id/id/eprint/2909 |