Badrul, Badrul (2025) Evaluasi Penyebab Kerusakan jalan Dan Rekomendasi Penanganan (Studi kasus Ruas Jalan SDN O4-Jalan Wonosari Barat). Other thesis, POLITEKNIK NEGERI BENGKALIS.
![[thumbnail of Abstrak]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
1. TA-4204211395-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.
Download (906kB)
![[thumbnail of Bab I Pendahuluan]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
2. TA-4204211395-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.
Download (2MB)
![[thumbnail of Daftar Pustaka]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
3. TA-4204211395-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.
Download (371kB)
![[thumbnail of Full Text]](https://eprints.polbeng.ac.id/style/images/fileicons/text.png)
4. TA-4204211395-full-Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.
Download (8MB) | Request a copy
Abstract
This study aims to analyze the factors causing road damage and provide appropriate treatment recommendations based on actual field conditions. The case study was conducted on the
SD.04 – West Wonosari Road section in Bengkalis Regency. The methods used included direct visual surveys, damage dimension measurements, road condition analysis using the Bina Marga method, and cost budget planning (RAB) calculations based on the damage data found. The dominant types of damage at the study site included longitudinal cracks, subsidence, grooves, and potholes, caused
by a combination of factors such as malfunctioning drainage, poor material quality, excessive traffic loads, and lack of routine maintenance. The analysis results indicate the need for a treatment program consisting of routine maintenance, periodic maintenance, rehabilitation, and reconstruction in certain segments. These treatment recommendations are expected to serve as a technical reference for improving road performance and service life on the study section and similar road sections in other areas. The budget plan (RAB) used for repairs to damaged road areas is IDR 15,974,000.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Road damage, Bina Marga, drainage, maintenance, treatment recommendations. |
Subjects: | 600 – ILMU TEKNIK DAN ILMU TERAPAN > 624 – Teknik Sipil dan Konstruksi > 624.4 – Konstruksi Jalan dan Jalan Raya |
Divisions: | Jurusan Teknik Sipil > Sarjana Terapan (D-IV) Teknik Perancangan Jalan dan Jembatan > SKRIPSI |
Depositing User: | D-IV TPJJ A 2021 |
Date Deposited: | 20 Aug 2025 14:37 |
Last Modified: | 20 Aug 2025 14:37 |
URI: | https://eprints.polbeng.ac.id/id/eprint/2061 |